Monday, April 16, 2007

The walls keep closing in

With the tub in place, we were able to frame the wall in which the tub plumbing will run. This is the third section of wall we've framed. It went relatively smoothly this time around, though it's always a struggle to nail the planks between the ceiling joists - even more so this time because we're running out of room up there with all these walls going up!

This wall section was much like the others except a little longer and therefore with an extra stud. Determined to complete this task before leaving, we didn't load into the van until 2:30am. A new record!



- John